![Froling TX 150 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744024.webp)
❒ Place cross elements on longitudinal elements and bolt it together at the angles
4.5.8 Installing upper main frame of insulation
❒ Place the heat insulation mat as shown on the boiler and position the cable routing
above
❒ Screw the cable routing to the boiler laterally
❒ Place longitudinal elements on the front and the back of the boiler
❒ When putting on make sure that the lug of the cable routing threads into the frame
4
Assembly
Mounting steps
24
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froling.com