![Froling TX 150 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/froling/tx-150/tx-150_installation-instructions-manual_2338744025.webp)
❒ Fix longitudinal elements to the boiler laterally
❒ At the heat exchanger side, place cross elements on longitudinal elements and
bolt it together at the corners
4.5.9 Installing the frame for the insulating door
❒ Place frame element for insulating door on the front
❒ Screw the frame element together with the upper and lower longitudinal element
❒ Insert insulation on the left and the right of the combustion chamber door
Assembly
4
Mounting steps
Installation Instructions TX 150-250 | M1320112_en
25