190
Figure 2.2.7.9.1.4-3
P25 Phase 2 Symbol Rate Measurement
2.2.7.9.2
P25 phase 2 receiver tests
P25 phase 2 receiver tests are performed with the R8100 in Generate mode and protocol specific tests are
accessed with the P25 II soft key - see Figure 2.2.7.9.2-1. The R8100 can generate various P25 compliant
test patterns using HDQPSK and HCPM – see Figure 2.2.7.9.2-2. They can be used in conjunction with
the radio manufacturers’ RSS to perform BER testing and alignment.
Содержание R8100 SERIES
Страница 19: ...19 Figure 2 1 2 Left and Right Sides of the R8100...
Страница 164: ...164 Figure 2 2 7 7 5 Power Profile Frame with Markers...
Страница 224: ...224 Figure 3 2 9 6 1 Submenu after pressing Options soft key in the Settings menu...
Страница 243: ...243 PTC Test in Monitor Mode Eye Diagram Display...
Страница 244: ...244 Power Profile Display Linear and Circular Constellation Displays...
Страница 245: ...245 Symbol Distribution Plot...