8 Start-up
FLUXUS G722ST-HT
8.1 Start-up settings
77
UMFLUXUS_G722ST-HTV1-2EN, 2021-09-01
8.1
Start-up settings
When starting up the transmitter for the first time, the following settings are required:
• language
• time/date
• unit of measurement
These displays will only be indicated when the transmitter is switched on for the first time or after an initialization.
The available transmitter languages are displayed.
• Select a language.
• Press ENTER.
The menus are displayed in the selected language.
The current time is displayed.
• Press ENTER to confirm the time or set the current time via the numeric field.
• Press ENTER.
The current date is displayed.
• Press ENTER to confirm the date or set the current date via the numeric field.
• Press ENTER.
• Select
Metric
or
Imperial
.
• Press ENTER.
• Select
Yes
if the transmitter is to be used in the region of Canada.
• Press ENTER.
This display will only be indicated if
Imperial
is selected.
Language
Set time
Set date
Units of measurement
Region of Canada
Содержание FLUXUS G722ST-HT
Страница 1: ...FLUXUS G722ST HT UMFLUXUS_G722ST HTV1 2EN Operating instruction...
Страница 6: ...Table of contents FLUXUS G722ST HT 2021 09 01 UMFLUXUS_G722ST HTV1 2EN 6...
Страница 173: ...Annex FLUXUS G722ST HT D Conformity declarations 173 UMFLUXUS_G722ST HTV1 2EN 2021 09 01 D Conformity declarations...
Страница 174: ...Annex D Conformity declarations FLUXUS G722ST HT 2021 09 01 UMFLUXUS_G722ST HTV1 2EN 174...
Страница 175: ......