Chapter 3
INSTALLATION
3.1
GENERAL CONNECTION
PRINCIPLES
3-3
Cable selection – RIO cable
3-4
Cable selection – operating voltages
3-4
Connecting the cables to the
plugs/sockets
3-5
3.2
RIO NODE
3-7
Opening and closing the node
3-8
Configuring the valve terminal
3-10
Setting the RIO address
3-11
Setting the RIO baud rate
3-14
3.2.1 Type 03:
Connecting the operating voltages
3-15
Power unit
3-17
Calculating the current
consumption of type 03
3-18
Potential
equalization 3-19
Connection example type 03
3-20
3.2.2 Type 05:
Connecting the operating voltages 3-22
Power unit
3-24
Calculating the current
consumption type 05
3-25
Potential equalization
3-26
Connection example type 05
3-27
3.2.3 Connecting the RIO interface
3-29
Fitting the terminating resistor
3-33
VIFB8 - 03/05
IV
9809c
Содержание 03-FB-8 Series
Страница 15: ...VIFB8 03 05 General safety instructions XIV 9809c ...
Страница 16: ...1 SYSTEM SUMMARY VIFB8 03 05 1 System summary 9809c 1 1 ...
Страница 28: ...2 FITTING VIFB8 03 05 2 Fitting 9809c 2 1 ...
Страница 41: ...3 INSTALLATION VIFB8 03 05 3 Installation 9809c 3 1 ...
Страница 74: ...4 COMMISSIONING VIFB8 03 05 4 Commissioning 9809c 4 1 ...
Страница 96: ...5 DIAGNOSIS AND ERROR TREATMENT VIFB8 03 05 5 Diagnosis and error treatment 9809c 5 1 ...
Страница 110: ...TECHNICAL APPENDIX VIFB8 03 05 Appendix A 9809c A 1 ...
Страница 122: ...INDEX VIFB8 03 05 Appendix B 9809c B 1 ...
Страница 126: ...V Valves 1 5 Voltage Cable selection 3 4 3 17 3 24 Connecting 3 15 3 19 3 22 3 26 3 29 VIFB8 03 05 Appendix B 9809c B 5 ...
Страница 127: ...VIFB8 03 05 Appendix B B 6 9809c ...