Starting the test routine
1. Switch off the power supplies (pins 1 and 2).
2. Open the node.
3. Note the positions of the address selector
switches and the DIL switch elements.
4. Set address 99 and DIL switch elements 1
and 2 to OFF.
5. Switch on the power supplies (pins 1 and 2).
6. Set the desired test routine on the address
selector switches as follows:
7. Start: Set DIL switch elements 1 and 2 to ON.
If errors occur when the test routine is star-
ted, the green LED of the field bus node will
flash quickly. The procedure must then be re-
peated.
Stopping the test routine
1. Switch off the power supplies (pins 1 and 2)
of the terminal.
2. Set the address selector switches and the
DIL switch elements to their original positions.
Test routine
Address to be set
Parallel
0, 1 or 2
Serial
3
Fig. 5/8: Setting the test routines
VIFB8 - 03/05 5. Diagnosis and error treatment
5-10
9809c
Содержание 03-FB-8 Series
Страница 15: ...VIFB8 03 05 General safety instructions XIV 9809c ...
Страница 16: ...1 SYSTEM SUMMARY VIFB8 03 05 1 System summary 9809c 1 1 ...
Страница 28: ...2 FITTING VIFB8 03 05 2 Fitting 9809c 2 1 ...
Страница 41: ...3 INSTALLATION VIFB8 03 05 3 Installation 9809c 3 1 ...
Страница 74: ...4 COMMISSIONING VIFB8 03 05 4 Commissioning 9809c 4 1 ...
Страница 96: ...5 DIAGNOSIS AND ERROR TREATMENT VIFB8 03 05 5 Diagnosis and error treatment 9809c 5 1 ...
Страница 110: ...TECHNICAL APPENDIX VIFB8 03 05 Appendix A 9809c A 1 ...
Страница 122: ...INDEX VIFB8 03 05 Appendix B 9809c B 1 ...
Страница 126: ...V Valves 1 5 Voltage Cable selection 3 4 3 17 3 24 Connecting 3 15 3 19 3 22 3 26 3 29 VIFB8 03 05 Appendix B 9809c B 5 ...
Страница 127: ...VIFB8 03 05 Appendix B B 6 9809c ...