SCX – 60CF ASSEMBLY INSTRUCTIONS
FIRST THINGS FIRST
A) ASSUMPTIONS These instructions assume several things:
1. You have at least some experience building R/C cars. These
instructions are not written for a first-timer.
2. You have the usual assortment of R/C tools.
3. You have a Team Associated SC 10 rolling chassis, any model.
If you do not meet all the assumptions above, please contact us
immediately. Contact information is on Page 5.
WE WANT YOU TO HAVE A PLEASANT EXPERIENCE
BUILDING THIS KIT, AND HOPE YOU HAVE MANY
PLEASURABLE DAYS DRIVING YOUR NEW SCX – 60CF.
Please contact us with the slightest problem. We want to help.
Talking with the Family is so much more fun than work.
B) We suggest you have a clean, well-lit work area with enough space to
simultaneously do three things: Work on the truck; Store sub-
assemblies for later use; Store parts no longer needed.
C) Before threading screws into any plastic part, tap holes with a 4-40 tap.
D) Many drivers use thread locking fluid when mounting aluminum parts
to the CF chassis. Others do not, and make a ritual of checking these
screws. Take your pick.
E) You will want to re-build many components, for example shocks, or to
disassemble some assemblies for inspection and cleaning. We
include no instructions for this – refer to your SC10 manual.
F) All references to right and left are from the viewpoint of the driver
sitting in the car facing forward.
G) Throughout this manual the names of many parts are followed by a
number in parenthesis. This is the X Factory or AE part number.
H) To photograph this manual, we assembled the truck several times. In
some photos, parts you have already assembled are “missing.” We
have done this deliberately so you may clearly see this particular step.
Follow the steps in order and you’ll get to the end quickly.