Irideon Control Installation and User Manual
21
•
AC Power connects to the terminal block, referenced by #1, on the left side
of the ATC.
•
Data and DC Power from the MCP terminates to the terminal block, refer-
enced by #4, on the ATC.
•
The Astronomical Timeclock, referenced by # 2, is used for initial program-
ming. No Contractor wiring termination required, wiring is by the factory.
•
The Contact Closure, referenced by # 3, is used as the interface for the
MCP system to the Astronomical Time Clock. This station will be ad-
dressed by the contractor. The address information should come from the
same source as the luminaire addresses. Wiring for these components by
the factory, no contractor terminations necessary.
Step 2:
Wiring:
a. Data and DC Power should be run from the MCP.
a. Connect Data and DC Power to the ATC following the label
chart inside the ATC:
1
2
3
4
GND from MCP
24VDC from MCP
Data (-) from MCP
Data (+) from MCP
Data Shield
Input Common 2
Closure Input 2
Input Common 3
Closure Input 3
Input Common 4
Closure Input 4
Input Common 5
Closure Input 5
Term Block 2
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...