Irideon Control Installation and User Manual
17
Input Power and Control Cabling for Irideon
Control System
N o t e :
The following wiring requirements apply to Irideon products with the
exception of the Luminaire Programming Jack (LPJ) and the Keyswitch
(KS) station.
Data and AC power are to be routed through separate conduit. When
terminating data and AC power in a common junction box, wiring must be
separated by a dividing panel.
Data and DC power from MCP to Remote Stations may be routed through
the same conduit. Termination of data and DC power within the junction
box does not require isolation of power and data lines.
Signal Type
From Source To:
In Conduit
Without Conduit
Data
Luminaire
Belden 9729
Belden 89729
Data
Remote Stations
Belden 9729
Belden 89729
DC Power
Remote Stations
Belden 8461 or
2-#18 gauge
Not Recommended
AC Power
Luminaire
18-10 AWG
Not Recommended
AC Power
MCP / DMX Interpreter 18-10 AWG
Not Recommended
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...