Irideon Control Installation and User Manual
39
•
No lights flash during the third and fourth second of the test sequence.
•
At the end of this four second test, the test sequence will recycle and
continue cycling until the test switch is returned to its normal operation
position.
MCP Programming Receptacle (MPR) and Closure Station (CS)
- the
MCP Programing Receptacle station and Closure Station both have one
LED.
•
This LED will flash at a fast rate for one second, then turn off for one
second, then flash at a fast rate for one second.
•
This cycle will continue until the MCP test switch is returned to its
normal operation position.
Astronomical Time Clock (ATC)
- the ATC has one LED which is only
visible with the front panel removed.
•
This LED will flash at a fast rate for one second, then turn off for one
second, then flash at a fast rate for one second.
•
This cycle will continue until the MCP test switch is returned to its
normal operation position.
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...