18
Installation
Installation Procedure
Master Control Processor (MCP)
The Master Control Processor is available in rack mount and wall mount
versions.
Step 1:
Mounting:
a. For rack mount, attach the two mounting brackets to the
sides of the MCP and secure into a 4U space on a standard
19” rack.
b. For wall hung, remove both left and right front panels and
secure unit to wall surface. Do not recess into the wall.
N o t e :
Knockouts are located on top, bottom, and sides of MCP to facilitate
hookup.
AC voltage connects to the terminal block located behind the left front
panel. In the rack mount version, an IEC connector has been installed on
the back panel and wired to the AC terminal block. An IEC power cord is
required, but not supplied by ETC, for the rack mount MCP.
DC voltage to the Astronomical Time Clock or Remote Stations and all
data connections are to terminal blocks located behind the right front
panel.
Two part plug-in terminal strips are utilized to connect wiring from the MCP
to the Astronomical Time Clock or Remote Stations and the luminaires.
N o t e :
If your installation includes an Astronomical Time Clock (ATC), Data
(P3) and DC Power (P2) from the MCP will terminate to the ATC.
If your installation does not include an ATC, Data (P3) and DC power
(P2) from the MCP will terminate to the 1st Remote Station.
ATTACH
TO WALL
AT THESE
POINTS
ATTACH
TO WALL
AT THESE
POINTS
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...