22
Installation
b. Connect AC power to the AC terminal block following the
label chart inside the ATC:
Step 3:
If your installation includes Remote Stations, continue the single
daisy chain run for the Data and DC Power to the next station.
Step 4:
Using a small screwdriver, set the two rotary switches found on
the ATC’s Contact Closure station to the fixture address
assigned to the ATC. This address information should come
from the same source as the luminaire addresses.
Step 5:
Replace the ATC front panel.
Содержание IRIDEON
Страница 10: ...6 Introduction This page intentionally blank...
Страница 44: ...40 System Test This page intentionally blank...
Страница 50: ...46 Troubleshooting This page intentionally blank...
Страница 60: ...56 Maintenance This page intentionally blank...
Страница 64: ...60 Software Hardware Components This page intentionally blank...
Страница 70: ...66 Astronomical Time Clock installation instructions This page intentionally blank...
Страница 83: ...Irideon Control Installation and User Manual 79 This page intentionally blank...