
Pellet store
Information about pellet hoses
81
Example for ventilating the pellet store
Fig. 13-10: Filling nozzle in open air
1
ventilated sealing caps
If the filling nozzles lead inside a building, a
separate air line is to be set up from the pellet
store into the open. This must be designed so that no
dust escapes during filling and also no water can
penetrate from outside into the pellet store.
Fig. 13-11: Filling nozzle inside building
1
Sealed, unventilated sealing cover
2
Ventilation opening outside
Even if the filling nozzles protrude into a room in which
ventilation is available, ÖNORM M 7137 recommends
using only sealed, unventilated sealing covers.
Fig. 13-12: Filling nozzles in the boiler room
1
Ventilating the room
2
Sealed, unventilated sealing cover
3
Ventilation opening outside
If the pellets are stored in a bag that positioned in the
same room as the boiler, ventilation must be available
in this room. Operation of the boiler with external air
supply (as long as this is supported) is then not
possible.
Fig. 13-13: Bag in boiler room
1
Ventilating the room
2
Bag
3
Filling nozzle
13.8
Information about pellet hoses
Suitable pellet hose
DN50 pellet hoses with copper litz wire (for earthing)
are required for the suction and return air.
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...