
58
www.eta.co.at
Installing the electrical unit
Electrical connections
10.2
Installing the electrical unit
Connecting the electrical unit to the circuit board [HA-C5]
All components of the pellet module (stoker screw, dosing screw, vacuum turbine, sensors) are already pre-wired to
the electrical unit from factory. Connect all plugs to the circuit board [HA-C5] and the 230 V power supply at the
terminal blocks. See the following graphic.
Fig. 10-8: Installing the electrical unit
The pellet discharge (a screw discharge, in this example) is connected to the orange plug (of S40, L1).
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...