Installation
Filling the heating system
53
Installing the pellet hoses on the pellet hopper
On the ends of both pellet hoses, free around 10 cm of
the copper wire strands from the hoses.
Fig. 9-50: Exposed copper wire strands
Push the two pellet hoses onto the connections and
secure them with hose clamps.
Fig. 9-51: Connections on the pellet bin
Connect the copper wire strands from both pellet
hoses to the yellow-green earthing cable (next to the
connections).
Fig. 9-52: Connecting the copper wire strands to the earth
Mounting the pellet hoses on the discharge
On the ends of both pellet hoses, free around 5 cm of
the copper wire strands from the hoses. Bend the
copper wire strand inside the pellet hose.
Fig. 9-53: Copper wire strands
Push the two pellet hoses onto the connections and
secure them with hose clamps.
9.12
Filling the heating system
Filling the heating system
Fill the heating system with softened water, refer to
chapter
.
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...