
48
www.eta.co.at
Ash box
Installation
If the pellet module is located on the right side of
the boiler, the following graphics apply.
Fig. 9-32: Ash duct (stoker on right)
Fig. 9-33: Flap
Attaching the ash box
Open the flap on the ash box.
Fig. 9-34: Flap
Fold the locking lever on the boiler forwards.
Fig. 9-35: Locking lever
Push the ash box over the connection on the boiler and
connect it to the boiler with the locking lever.
Set the height of the attached ash box so that the
ash box lies evenly on the floor.
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...