
70
www.eta.co.at
Dismantling, disposal
12 Dismantling, disposal
Dismantling
Before dismantling:
•
Stop heating. Switch off the boiler with the mains
switch and ensure that it cannot be switched back
on.
•
Disconnect the boiler (and possibly also the fuel
conveying system) from all power sources.
Dismantling is done in the reverse order of assembly.
Clean the parts and remove them in accordance with
the local regulations for workplace safety and environ-
mental protection.
Disposal
Disposal including all components must be done in an
environmentally friendly manner according to waste
disposal laws. Recycle any materials that can be
recycled.
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...