Tilted floor
Pellet store
Fig. 13-8: Tilted floor design for suction heads
1
Formwork panel
2
Suction head
3
Filling nozzle
4
Back air nozzle
5
Switch unit
6
Support span
The tilted floor must withstand the weight of the pellets
(bulk weight 650 kg/m³). Assuming the usual commer-
cially available formwork panels with a width of
100 cm, members of the support frame should have a
separation of 50 or 100 cm. For these separations, the
following tables show the required beam thicknesses
depending on the room width.
Tilted floors may not touch the wall
The tilted floor may not touch the wall, otherwise
noise emissions will be transferred. For this
reason, a small gap is to be left between the tilted floor
and wall, and sealed with silicon.
Fig. 13-9: Seal gap with silicon
Mount suction heads on a board
If the suction heads sit directly on a cold concrete floor,
water from the circulating air can condense on them.
The condensation can cause pellets and, in particular,
pellet dust to form clumps that can clog the pneumatic
conveyor. To avoid this, always mount the suction
heads on a wooden board (25 or 27 mm thick) and
fasten it to the floor.
Pad wall opening for conveyor screw trough
Sound from the screw can be transmitted through the
pellet store walls into the house. To avoid that, pad the
wall opening for the troughs with soft material (mineral
wool).
Under no circumstances should the conveyor screw
trough be cemented into a concrete wall without
acoustic insulation.
Beams for support frame, beam separation
100 cm, room height 2.5 m
Cross section
(cm)
Support span
(m)
Room width
(m)
10 x 5
1.50
2.25
12 x 6
2.00
3.00
10 x 10
2.20
3.30
15 x 5
2.35
3.50
Beams for support frame, beam separation
50 cm, room height 2.5 m
Cross section
(cm)
Support span
(m)
Room width
(m)
8 x 4
1.50
2.25
10 x 5
2.20
3.30
12 x 6
3.00
4.50
10 x 10
3.40
5.10
Beams for support frame, beam separation
50 cm, room height 2.5 m
Cross section
(cm)
Support span
(m)
Room width
(m)
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...