
Installation
Connecting piping
51
Slide the metal plates into the slots in the floor pan.
This pushes the insulation together in the centre
section.
Fig. 9-44: Metal strips
Carefully push the floor pan under the boiler until it
lines up with the rear end.
Fig. 9-45: Floor pan
Then pull the metal strips out of the floor pan and
dispose of them.
Fig. 9-46: Metal strips
9.10
Connecting piping
Connecting the piping to the boiler
1
Connection for safety valve, pressure gauge and
bleed valve
2
Flow
3
Return
4
Filling and draining valve
Installing the thermal emergency cooling valve
Remove the plug screw from the top of the boiler and
install the immersion sleeve for the capillary sensor.
Fig. 9-47: Immersion sleeve
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...