
Installation
Removing panels
43
9.4
Removing panels
Dismantling the side panels
Remove the side panels from each side of the boiler on
which the stoker will later be mounted.
Fig. 9-12: Side panels
9.5
Align boiler horizontally
Aligning the boiler horizontally
Check the horizontal alignment of the boiler covers
and adjust them by placing metal plates underneath.
Fig. 9-13: Checking the alignment
The horizontal alignment of the boiler is important
because the electrode in the precipitator must be
an equal distance away from the inner walls on all
sides. Even if the boiler is not equipped with a precipi-
tator, it must still be horizontally aligned because the
precipitator may be retrofitted at a later time.
Horizontal alignment is also important for the separate
ventilation connection. For this reason, never align the
boiler to be "rising" or "falling".
9.6
Installing the pellet bin
Installing the stoker on the boiler
Inspect the affixed seal to ensure it is in good order;
replace it if necessary.
Fig. 9-14: Seal
Fasten the stoker to the boiler. Initially only hand-
tighten the screws.
Fig. 9-15: Stoker
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...