
Installation
Cables
49
9.8
Cables
Routing the lines to the circuit boards
The electrical unit is located on the pellet module and
is already pre-wired.
Fig. 9-36: Electrical unit on pellet module
Fig. 9-37: Electrical unit
Install the electrical unit next to the boiler circuit board.
Fig. 9-38: Electrical unit
The cable lengths of the cable harness are
defined from factory and fixed with cable ties so
that the cable harness can be laid quickly. These cable
ties should not be removed. If there are excess cable
lengths, create a loop near the circuit boards and
fasten with a cable tie.
Thread the cable harness into the electrical unit and
guide it to the stoker.
Fig. 9-39: Cable ducts
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...