
46
www.eta.co.at
Installing the pellet bin
Installation
3. Loosen the screws on the lid. Carefully lift the lid
and place it on the pellet hopper.
Fig. 9-25: Lid
4. Dismantle the pellet hose connection. Also remove
the blind cover from the desired position. In this
example, the connection is rotated by 90°.
Fig. 9-26: Replacing the connection and blind cover
Replace the connection and blind cover and
reinstall them on the pellet hopper. Make sure not
to damage the included seal during installation.
5. Turn the lid and re-attach it. Both connectors for
the pellet hoses must point in the same direction.
Fig. 9-27: Attaching the lid
6. Re-attach the covers.
Fig. 9-28: Side panels
Содержание 13180 LP-D
Страница 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Страница 55: ...Installation Network connection 55 ...
Страница 61: ...Electrical connections Overview of circuit boards 61 ...
Страница 65: ...Electrical connections Circuit board HA C5 65 ...
Страница 85: ......
Страница 86: ...www eta co at ...
Страница 87: ......
Страница 88: ...www eta co at www eta co at downloads DOWNLOAD ...