1
3/1531-ZAP 701 14/1 Uen A 2006-10-16
AXX 9100 CONNECT R1.2 Quick Reference Guide
1
Installation of AXX 9100 CONNECT
1
1.1
Pre-Installation Procedures
This section provides pre-installation procedures for the
AXX 9100 CONNECT.
1.1.1
Shipment verification
When the AXX 9100 CONNECT equipment is received, please
verify that the shipment is according to order.
N O T E !
Ship equipment from one site to another in the original
packing including the antistatic bags.
N O T E !
Keep the AXX 9100 CONNECT system equipment in the
original shipping containers if storage is required. Storage
more than 12 months is not recommended. The equipment
should be stored in a ventilated and static-safe location.
1.1.2
Preliminary inventory check
Verify that the packing list information is equal to the information
provided on the shipping labels. Please notify contact resource to
your support if any discrepancies must be reported.
1.1.3
Reporting damage
Damage to shipped articles must be reported to contact resource.
1.2
Site Preparation
Verify that the installation site meets the following criteria: