INITIAL START-UP
The monitor is checked and calibrated in factory before delivery.
3.1.1
PRELIMINARY OPERATIONS (FIGURE 3–1)
Start-up first consists in carrying out the following preliminary operations:
Visually examine the interior of the instrument to ensure that no component has been damaged
during transport.
Connect the supply cable of the pump assembly (5).
Connect the pump sampling pipe to the analyzer "pump outlet" (8).
Connect the regulated sampling tube (RST) as indicated in section1.2.4.2 / a.3 of chapter 1, titled
as:
Installing the regulated sampling tube (RST)
.
Connect the cord of sampling head heating (3) and the supply cable of the meterological sensors
(6).
Connect the electrical (mains) power supply cable (1) to a 230 V - 50 Hz + ground socket or to a
115 V - 60 Hz + ground socket, according to the power supply specified on order.
Connect the digital outlets to the DB25 connector (4).
Connect the TCP/IP socket (7) if needed.
Connect the CPM socket (11) if CPM option available.
(1) general fuse F1 and electrical (mains) power supply block, (3) TUCHEL connector for heating of
sampling head inlet, (4) RS232/RS422 socket, (5) power supply of external pump, (6) head sensors,
(7) TCP/IP socket, (8) pump outlet, (11) connection socket with the CPM option.
Figure 3–1 – Fluids and electric connection
Содержание MP101M
Страница 8: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 0 8 Page intentionally blank...
Страница 18: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 0 18 Page intentionally left blank...
Страница 23: ...Duplication prohibited MP101M EnvironnementS A 1 5 SEPTEMBER 2013 Figure 1 3 Front face with the door closed...
Страница 40: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 1 22 Figure 1 12 Outline dimensions...
Страница 56: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 2 14 This page is intentionally left blank...
Страница 114: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 3 58...
Страница 131: ...Duplication prohibited MP101M EnvironnementS A 4 9 SEPTEMBER 2013...
Страница 136: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 4 14 Page intentionally left blank...
Страница 140: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 4 18 Page intentionally left blank...
Страница 145: ...Duplication prohibited MP101M EnvironnementS A 4 23 SEPTEMBER 2013...
Страница 154: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 4 32 Page intentionally left blank...
Страница 156: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 5 2 Page intentionally left blank...
Страница 161: ...Duplication prohibited MP101M EnvironnementS A 5 7 SEPTEMBER 2013 Page intentionally left blank...
Страница 163: ......
Страница 164: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 5 10 Page intentionally left blank...
Страница 166: ...EnvironnementS A MP101M Duplication prohibited SEPTEMBER 2013 6 2 Page intentionally left blank...
Страница 184: ...EnvironnementS A ESTEL Board Duplication prohibited JUNE 2009 18 Page intentionally left blank...
Страница 192: ...EnvironnementS A DNP ARM7 board Duplication prohibited NOVEMBER 2009 8 Page intentionally left blank...