Proline Promass E 300 Modbus RS485
Commissioning
Hauser
75
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 29
• "Post-connection check" checklist → 42
10.2 Setting the operating language
Factory setting: English or ordered local language
The operating language can be set in FieldCare or DeviceCare: Operation → Display
language
10.3 Configuring the measuring device
• The
Setup
menu with its guided wizards contains all the parameters needed for standard
operation.
• Navigation to the
Setup
menu
X X X X
X X X
X
X
20.50
0104-1
XXXXXXXXX
XXXXXXXXX
mA
1.
2.
3.
Display/operat.
Setup
Diagnostic
Display/operat.
Setup
Main menu
English
Main menu
Medium selection
/ ../Setup
Display language
A0032222-EN
26
Taking the example of the local display
The number of submenus and parameters can vary depending on the device version.
Certain submenus and parameters in these submenus are not described in the
Operation Instructions. Instead a description is provided in the Special Documentation
for the device (→ "Supplementary documentation" section).
Setup
Device tag