
Doc
#
E154713
TOC-2
Table of Contents
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
2.4: Measurements and Calculations 2-7
2.6: Meter Specifications 2-15
2.8: Standards Compliance 2-21
3.1: Mounting the Nexus® 1500+ Meter 3-1
3.2: Meter and Panel Cut-out Dimensions 3-1
3.3: Mounting Instructions 3-5
3.4: Replacing the Meter’s Battery 3-8
4: Electrical Installation 4-1
4.1: Considerations When Installing Meters 4-1
4.2: Installing Current Transformer Sensors Terminated to Meter 4-5
4.3: Installing Current Transformer Sensors with No Meter
Termination (Pass Through) 4-6
4.4: Quick Connect Crimp-on Terminations 4-7
4.5: Nexus® 1500+ Meter’s Monitored Inputs 4-8
4.5.1.1: Wiring the Voltage Inputs 4-9
4.5.1.2: Fusing the Voltage Connections 4-9
4.5.2: Wiring the Vaux Input 4-9
Содержание Shark 100T
Страница 1: ...V 1 04 May 15 2018 ...
Страница 2: ...This page intentionally left blank ...