
Doc
#
E154713
12-13
12: Test Mode
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
5. The display shows a screen with Test Mode data and timestamp, your Mode of
Operation selection, Exit and Reset Buttons, and Test Mode status, e.g., Active - no
comp(ensation).
You can:
• Exit Test Mode by pressing EXIT. (Note that the meter will time out of Test Mode
after the programmed amount of time - see Section 12.4.)
• Reset Test Mode data by pressing RESET.
• Change the Test Mode’s Mode of Operation by pressing one of the radio buttons
at the top of the screen.
12.2.3: Entering Test Mode through a Communication Port
To enter Test Mode through a communication port:
1. Connect to the meter through Modbus via any of its communication ports.
2. Send a write command to address E031H to enter Test Mode and to select a
compensation type. If a password is enabled, the meter will request that you enter
the Level 2 password. The meter’s display will automatically show the Test Mode
screen.
3. While in Test Mode, you can:
• Send a write command to address E031H to select a specific Test Mode operation
• Send a read command to address E031H to verify that the meter is in Test Mode
Содержание Shark 100T
Страница 1: ...V 1 04 May 15 2018 ...
Страница 2: ...This page intentionally left blank ...