
Doc
#
E154713
12-5
12: Test Mode
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
• No compensation - Test Mode readings will be obtained without any compensa-
tion applied.
• Transformer loss compensation - your setting for Transformer Loss compensa-
tion will be applied to the readings in Test Mode.
• CT-PT compensation - your setting for CT/PT compensation will be applied to the
readings in Test Mode.
• Transformer loss and CT-PT compensation - both your settings for Transformer
Loss compensation and CT-PT compensation will be applied to the readings in
Test Mode.
4. Click Continue. You will see the Test Mode screen again. You will see a message
that Test Mode is starting and then you will see a message that the meter is in Test
Mode, with the compensation you selected and the values that are being read, also
displayed. See the example screen on the next page.
Содержание Shark 100T
Страница 1: ...V 1 04 May 15 2018 ...
Страница 2: ...This page intentionally left blank ...