
Doc
#
E154713
12-3
12: Test Mode
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
NOTES:
• No KYZ output can be programmed for End of Interval Pulse.
• No KYZ output can be programmed for Operation Status Output.
12.2: Test Mode Operation
The Nexus® 1500+ meter can enter Test Mode either through software, through the
display, or through a communication port via a Modbus command. With any of these
methods, before starting Test Mode, you need to select a compensation type for Test
Mode. It should be the same as the compensation that has been set up for the meter
in the device profile. The choices are:
• Test with No Compensation
• Test with Transformer Loss Compensation
• Test with CT/PT Compensation
• Test with Transformer Loss and CT-PT Compensation
For Test Mode demand, the interval configured in the meter’s device profile will be
synchronized either when the meter starts Test Mode, when a new Test Mode opera-
tion is selected, or when resetting Test Mode data. If the meter has been configured
for block window computation through a digital input, the Test Mode block window
interval will default to 15 minutes.
Содержание Shark 100T
Страница 1: ...V 1 04 May 15 2018 ...
Страница 2: ...This page intentionally left blank ...