
Doc
#
E154713
4-20
4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Figure 4.9: 3-Wire, 2-Element Open Delta** with 2 PTs and 2 CTs
* See Section 4.5.2.
** Typically used for Delta systems.
C
B
A
C
B
A
OR
Va
Vb
Vc
Vn
Vaux
N/U
CTs
Vc
Vb
Va
PTs
C
B
A
C
B
A
Earth
Ground
CT
Shorting
Block
Earth Ground
Fuses
3
x
0.
1A
Содержание Shark 100T
Страница 1: ...V 1 04 May 15 2018 ...
Страница 2: ...This page intentionally left blank ...