10
Set-up and Connection Instructions
Heat Recovery Connection
The schematic drawing also applies
to geothermal tube collectors.
Brine side circulating pump, expan-
sion vessel, manometer, charging
element and safety valve are already
installed in the AQUATOP T..C..
Safety line at an incline into an appro-
priate collection container.
Connections
Connection lines and distributors.
For multiple probes, adjusting devices
are compulsory on site. In addition, the
length and the diameter of the individual
probes must be labelled on the distributor.
With multiple probe fields, an additional
adjusting device per distributor must be
provided.
The adjustment of the probes and the
probe fields must take place on site.
Delivery/installation
by ELCO/ installation company
On-site
Ditches and openings
Recommendation: 5% of probe depth
Heat pump connection
Heat source booster pump and
safety equipment, connection lines,
insulation, heat transfer medium
Charge.
Delivery/installation
by ELCO/ installation company
Pr
o
b
e
d
e
p
th
installed on compact
units
7
6
1
2
4
5
6
3
1
Shut-off valve
2
Pressure monitor
3
Manometer
4
Expansion vessel
5
Safety valve
6
Filling and draining valves
7
Manual vent
8
Adjusting device (STAD,
Taco-Setter) per probe and
probe field
Geothermal probe
Boreholes geothermal probe
installation, and backfill
Delivery/installation
by ELCO/ drilling company
On-site
Sludge pit
8