ecoGEO C Installation and User Manual (Version 1.0)
page 55
3
5
4
4
2
6
1
ecoGEO C1
ecoGEO C2
ecoGEO C3
8 9
7
11
10
Number
Description
Number
Description
1
Heat pump
7
Filling valve A
2
Brine outlet
8
Filling valve B
3
Brine inlet
9
Filling valve C
4
Shut-off valve
10
External filling pump
5
Particle filter
11
External antifreeze mixture tank
6
Brine filling fitting
Figure 6.2.
Filling the brine circuit
Filling the brine circuit should be done by an external filling pump, as indicated in diagram
Figure 6.2
by
following these steps.
1.
Prepare the antifreeze mixture in suitable proportions in the external tank (11).
2.
Connect the discharge of the filling pump (10) to filling valve C (9).
3.
Connect a transparent hose from filling valve B (8) to the external antifreeze tank, so that its end is
immersed.
Содержание ecoGEO C
Страница 1: ...ecoGEO C Installation and user manual...