XDM-300 Installation and
Maintenance Manual
Equipment
Installation
417006-2311-0H3-A00 ECI
Telecom
Ltd.
Proprietary
3-7
Table
3-2: Outline of vertical XDM-300 installation sequence
Step Procedure
Section
1.
Install a rack (if required).
)
2.
Unpack and perform a visual inspection.
Unpacking and Visual
Inspection (on page
)
3.
Install ancillary equipment in the rack,
including:
|
xRAP-B, xRAP-100, or xRAP
|
Cable guide
|
Fiber guide for ETSI A racks
|
FST (optional)
|
ODF units (optional)
|
OPP (optional)
Note:
Installation of the optional
xDDF-21 channel patch panel is
implemented as part of the traffic cable
routing process.
Installing Ancillary Units in
Racks (on page
)
4.
Prepare the XDM-300 shelf for vertical
installation:
|
Remove the horizontal installation
brackets.
|
Install vertical installation brackets.
5.
Install the XDM-300 shelf in the rack.
Note:
If your site installation plan
includes TPU protection, the XDM-300 is
supplied with the TPU already installed.
If you need to connect a TPU unit to an
existing XDM-300 shelf, see Installing a
TPU on the XDM-300 Shelf.
Installing the Shelf in the Rack
(on page
6.
Install the air filter.
Installing the Air Filter
7.
Install the common cards in the
XDM-300 shelf, including:
|
FCU300
|
ECU300/ECU300-F
|
MXC300 with NVM flash card
Содержание XDM-300
Страница 1: ...XDM 300 Installation and Maintenance Manual Version 7 417006 2311 0H3 A00...
Страница 2: ......
Страница 8: ......
Страница 24: ...Introduction XDM 300 Installation and Maintenance Manual 1 8 ECI Telecom Ltd Proprietary 417006 2311 0H3 A00...