XDM-300 Installation and
Maintenance Manual
Equipment
Installation
417006-2311-0H3-A00 ECI
Telecom
Ltd.
Proprietary
3-5
Step Procedure
Section
7.
Install the modules in the XDM-300
shelf, including:
|
Optical and electrical I/O modules
(SIM, PIM)
|
EISMB/MCSM/DIOM data modules
|
Optical I/O cards (SIM16_4 or
SIM64_XFP)
|
SFP transceivers in optical XDM-300
modules
Installing XDM-300 Modules
8.
Install cards and modules in the optional
TPU, including:
|
TC/TCF module
|
Single-slot TPMs
|
Double-slot TPMs
|
Triple-slot TPMs
Installing TPU Modules
9.
Install blank covers where I/O modules,
cards, and TPMs are not used.
—
10.
Route and connect all cables and fibers
for ETSI A racks, including:
|
Power and alarm cables
|
Optical fibers to optical modules
transceivers
|
Electrical interface cables to
electrical modules (includes
installation of the optional xDDF-21
channel patch panel)
|
Electrical traffic through the TPU
|
Data cables to EISMB/MCSM/DIOM
modules
|
Timing cables
|
Management cables
Connecting Fibers and Cables in
ETSI A Racks (on page
)
11.
In some cases, it may be necessary to
connect a TPU unit to an existing
XDM-300 shelf.
Attaching TPUs/OCU to the
XDM-300 Shelf (on page
Содержание XDM-300
Страница 1: ...XDM 300 Installation and Maintenance Manual Version 7 417006 2311 0H3 A00...
Страница 2: ......
Страница 8: ......
Страница 24: ...Introduction XDM 300 Installation and Maintenance Manual 1 8 ECI Telecom Ltd Proprietary 417006 2311 0H3 A00...