Long-term parking
4812164101_A.pdf
2022-02-09
Long-term parking
The following instructions should be followed
when long term parking (more than one month).
The following instructions should be followed
when long term parking (more than one month).
Fig. Roller weather protection
These measures apply when parking for a period of up
to 6 months.
Before re-commissioning the roller, the points marked
with an asterisk * must be returned to the pre-storage
state.
Wash the machine and touch up the paint finish to
avoid rusting.
Treat exposed parts with anti-rust agent, lubricate the
machine thoroughly and apply grease to unpainted
surfaces.
Engine
* Refer to the manufacturer’s instructions in the engine
manual that is supplied with the roller.
Battery
* Remove the battery from the machine, clean, grease
the cable connectors (terminals) and trickle charge the
battery once a month. The battery is otherwise
maintenance free.
Air cleaner, exhaust pipe
* Cover the air cleaner (see under the heading ‘Every
50 hours of operation’ or ‘Every 500 hours of
operation’) or its inlet with plastic or tape. Also cover
the exhaust pipe opening. This is to avoid moisture
entering the engine.
Sprinkler system
* Drain the water tank completely (see under the
heading ‘Every 2000 hours of operation’). Drain all
hoses, filter housings and the water pump. Remove all
sprinkler nozzles (see under the heading ‘Every 10
hours of operation’).
Fuel tank
Fill the fuel tank completely full to prevent
condensation.
51
Содержание CC950
Страница 2: ......
Страница 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Страница 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Страница 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Страница 38: ...Machine description 4812164101_A pdf 2022 02 09 4812130471 Warning CALIFORNIA Proposition 65 28 ...
Страница 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Страница 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Страница 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Страница 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Страница 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Страница 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Страница 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Страница 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Страница 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Страница 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Страница 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...