Maintenance - 50h
4812164101_A.pdf
2022-02-09
Fuel pipes - Check
Fig. Fuel filter
1. Fuel pipe
2. Clamp band
Check or replace the fuel pipes after
stopping the engine.
Broken fuel pipes can cause fires.
Check or replace the fuel pipes after
stopping the engine.
Broken fuel pipes can cause fires.
If the clamp band (2) is loose, apply oil to the screw of
the band, and tighten the band securely.
Check the fuel pipe (1). Replace if wear or damage
are found.
Refer to the engine manual for detailed
instructions.
Refer to the engine manual for detailed
instructions.
Dispose of the old filter carefully.
Dispose of the old filter carefully.
Air cleaner - Clean
Fig. Air cleaner
1. Evacuator valve
2. Element
1
2
Open the evacuator valve (1) to get rid of large
particles of dust and dirt.
Wipe the inside air cleaner clean with cloth or like if it's
dirty or wet.
Avoid touching the element (2) except when cleaning.
When dry dust adheres to the element (2), blow
compressed air from the inside turning the element (2).
Pressure of compressed air must be under 205 kPa
(2.1 kgf/cm2, 30 psi).
Refer to the engine manual for detailed
instructions.
Refer to the engine manual for detailed
instructions.
94
Содержание CC950
Страница 2: ......
Страница 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Страница 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Страница 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Страница 38: ...Machine description 4812164101_A pdf 2022 02 09 4812130471 Warning CALIFORNIA Proposition 65 28 ...
Страница 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Страница 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Страница 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Страница 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Страница 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Страница 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Страница 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Страница 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Страница 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Страница 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Страница 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...