Operation
4812164101_A.pdf
2022-02-09
Sprinkler - Check
8
2
5
Fig. Control panel
- Non-pressurized sprinkler system
2. Parking brake
5. Flow switch, sprinkler
8. Ignition switch
Make sure that the parking brake (2) is activated.
Make sure that the parking brake (2) is activated.
Set the knob (5) for the sprinkler in the open position
and check that the drums are watered.
Fig. Control panel
- Pressurized sprinkler system
2. Parking brake
8. Ignition switch
9. Switch, sprinkler
9
8
2
On machine with pressurized sprinkler system:
Turn the starter switch (8) and start the sprinkler pump
with the switch (9).
Check that the drums are watered.
39
Содержание CC950
Страница 2: ......
Страница 14: ...Introduction 4812164101_A pdf 2022 02 09 4 ...
Страница 20: ...Safety when operating 4812164101_A pdf 2022 02 09 10 ...
Страница 24: ...Special instructions 4812164101_A pdf 2022 02 09 14 ...
Страница 38: ...Machine description 4812164101_A pdf 2022 02 09 4812130471 Warning CALIFORNIA Proposition 65 28 ...
Страница 46: ...Machine description 4812164101_A pdf 2022 02 09 36 ...
Страница 60: ...Operation 4812164101_A pdf 2022 02 09 50 ...
Страница 72: ...Miscellaneous 4812164101_A pdf 2022 02 09 62 ...
Страница 74: ...Operating instructions Summary 4812164101_A pdf 2022 02 09 64 ...
Страница 76: ...Preventive maintenance 4812164101_A pdf 2022 02 09 66 ...
Страница 80: ...Maintenance Lubricants and symbols 4812164101_A pdf 2022 02 09 70 ...
Страница 87: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 Service Checklist 77 ...
Страница 88: ...Maintenance Maintenance schedule 4812164101_A pdf 2022 02 09 78 ...
Страница 120: ...Maintenance 400 800 1200 1600 h 4812164101_A pdf 2022 02 09 110 ...
Страница 130: ...Maintenance 1000h 4812164101_A pdf 2022 02 09 120 ...
Страница 143: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...