Commissioning
Edition 03 / 69 06 898
40
FTS 8000
4.4
Daily commissioning
Before the daily commissioning process, technical room is to be switched off and the venti-
lator and gas sensors are not to be in operation.
Prerequisite
•
The "Assembly and installation" chapter has been successfully completed.
•
The chapter "Preparations for daily commissioning" has been successfully completed.
Procedure
1. Open the doors to the technical room and fix using a safety catch.
2. Check the fill level of the water bath pan for the fireplace in container 3 and top up if
necessary. The gas pipes laid in the water bath pans must be covered with at least
3 to 4 cm of water.
3. Checking the electrical connection. To do this, open the cover
door for the power connections and check the plugs and
cables for visible damage.
Fig. 44 Open doors
Fig. 45 Lock doors
Fig. 46 Water bath tank
Fig. 47 Check the filling level
Fig. 48 Electrical