![Dover Tipper Tie RS4203 Скачать руководство пользователя страница 102](http://html1.mh-extra.com/html/dover/tipper-tie-rs4203/tipper-tie-rs4203_user-manual_2524921102.webp)
RS4203 Manual
Chapter 14 – Maintenance Guide
Rev 32, 01/11/13
Copyright © 2013, Tipper Tie, Inc., All rights reserved
102
___ Movable voiders extend or separate away from fixed voiders.
___ Clipper swings down in between both pairs of voiders.
___ Clipper gate closes.
___ Clipper punch extends down and knife is fired.
___ Clipper gate opens, clipper swings back, and both voiders open.
___ Movable voiders retract towards fixed voiders.
___ Test Mode cycle has been completed.
___ Check that all air gauges are functional (clipper regulator and main incoming air).
14.11.6 Notify Production
Notify production that maintenance and setup is complete and the machine is ready for operation.
14.11.7 Observe Proper Lubrication
Before signing off the machine, during the initial operation of the machine, observe the lubrication drop
rates and adjust if necessary.