2. INSTALLATION
Page 7
© 2009 DH Instruments, a Fluke Company
2.3
INITIAL SETUP
2.3.1
PREPARING FOR OPERATION
To prepare PPCH for check out and operation:
Remove the plastic caps from the PPCH rear panel pressure connections.
Remove the protective plastic sheet from the front panel display.
Familiarize yourself briefly with the front and rear panel (see Section 2.3.2).
Then proceed with Sections 2.3.3 to 2.3.11.
2.3.2
FRONT AND REAR PANELS
2.3.2.1
FRONT PANEL
1. Ready/Not Ready Indicator
2. Display
3. Remote activity indicator
4. Cursor control keys
5. Multi-function keypad
6. Direct pressure control keys
Figure 1.
Front panel
Содержание PPCH
Страница 10: ...PPCH OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page VIII N NO OT TE ES S...
Страница 106: ...PPCH OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 96 N NO OT TE ES S...
Страница 144: ...PPCH OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 134 N NO OT TE ES S...
Страница 182: ...PPCH OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 172 N NO OT TE ES S...
Страница 190: ...PPCH OPERATION AND MAINTENANCE MANUAL 2009 DH Instruments a Fluke Company Page 180 N NO OT TE ES S...