PG7000™ OPERATION AND MAINTENANCE MANUAL
© 1998-2008 DH Instruments, a Fluke Company
Page 98
being used. This information is entered, viewed and edited under
[SPECIAL]
,
<1PC/MS>
.
This is also where the active mass and mass loading bell are selected.
The piston-cylinder module and mass set information required by PG7000 is reported on the
Calibration Reports that are delivered with the metrological elements. When the PG7000
Platform and metrological elements are delivered together, the metrological elements
information is entered by
DHI
at the factory. If the metrological elements are delivered
separately from the platform or after a recalibration when new data is available, the information
must be entered or edited by the user.
OPERATION
To access the piston-cylinder module, mass set and
mass loading bell information, press
[SPECIAL]
and
select
<1PC/MS>
. The display is:
1PC 2mass set
3mass bell
Select the type of metrological element that you would like to view, edit, create or select.
See Sections 3.11.1.1 to 3.11.1.7 for operation of specific piston-cylinder module, mass set
and mass bell functions as follows:
•
Create a new piston-cylinder module (see Section 3.11.1.1).
•
Edit piston-cylinder module information (see Section 3.11.1.2).
•
View piston-cylinder module information (see Section 3.11.1.3).
•
Delete a piston-cylinder module (see Section 3.11.1.4).
•
Select the active piston-cylinder module (see Section 3.11.1.5).
•
Create a new mass set (see Section 3.11.1.6).
•
Edit mass set information (see Section 3.11.1.7).
•
View mass set information (see Section 3.11.1.8).
•
Delete a mass set (see Section 3.11.1.9).
•
Select a mass set (see Section 3.11.1.10).
•
Add a mass loading bell (see Section 3.11.11).
•
Edit mass loading bell information (see Section 3.11.12).
•
View the active mass loading bell (see Section 3.11.1.13).
•
Delete a mass loading bell (see Section 3.11.1.14).
•
Select a mass loading bell (see Section 3.11.1.15).
3.11.1.1
CREATE PISTON-CYLINDER MODULE
PURPOSE
To create a new piston-cylinder module that will be available for selection from
the
[P-C]
function key. Use this function when a new piston-cylinder module has
been acquired.
If the piston-cylinder module and PG7000 Platform were delivered together, the
piston-cylinder module has already been entered at the factory. Before creating a new
piston-cylinder module, press [P-C] to check if it already exists (see Section 3.9.2).
Содержание PG7000
Страница 10: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page VIII N NO OT TE ES S ...
Страница 44: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page 34 N NO OT TE ES S ...
Страница 182: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page 172 N NO OT TE ES S ...
Страница 210: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page 200 N NO OT TE ES S ...
Страница 214: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page 204 N NO OT TE ES S ...
Страница 224: ...PG7000 OPERATION AND MAINTENANCE MANUAL 1998 2008 DH Instruments a Fluke Company Page 214 N NO OT TE ES S ...