MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
88
7. Checking and maintenance
7.2 Maintenance message
It is mandatory to have the boiler inspected and
serviced on a yearly basis. To determine the best time
for maintenance, the boiler is fitted with a function that
automatically signals any maintenance to be carried
out. The appearance of this service message on the
boiler display is determined by the automatic control
unit
WARNING
• Maintenance operations must be done by a
qualified proffesional.
• An annual inspection is mandatory.
• Only original spare parts must be used.
7.3 Preventive maintenance with automated
service message
When it is time to carry out maintenance on the boiler,
the following instructions are shown on the display:
In a yellow display:
• The symbol
• The symbol
SERVICE
• Maintenance message
A
,
b
or
c
The maintenance message indicates which kit should be
used. If no other faults are noted during the inspection
initiated subsequent to the maintenance message,
these maintenance kits include all of the parts needed
for the maintenance concerned (such as the gaskets,
Kits
Part No.
Item Description
Boiler Model
MM176234DD
Kit for low water cut-off with test button
MCA Pro 35-115
S52484
Cleaning tool for heat exchanger
MCA Pro 35/45/65
S58286
Cleaning tool for heat exchanger
MCA Pro 90/115
S103209 Service Kit A
*Annual maintenance kit (Sealing heat exchanger front plate, M6 nuts
frontplate, Ignition/ionization electrode including gasket and screws) MCA Pro 35-115
S103210 Service Kit B
*Annual maintenance kit (Sealing heat exchanger front plate, M6 nuts
frontplate, Ignition/ionization electrode including gasket and screws,
Insulation plate heat exchanger)
MCA Pro 35-115
S103211 Service Kit C
*Annual maintenance kit (Sealing heat exchanger front plate, M6 nuts
frontplate, Ignition/ionization electrode including gasket and screws,
Insulation plate heat exchanger, Non return valve with gasket)
MCA Pro 35-115
S57241
Sealing heat exchanger front plate
MCA Pro 35-115
S54731
Insulation plate heat exchanger
MCA Pro 35-115
FAILURE TO REINSPECT THIS VALVE AS
DIRECTED COULD RESULT IN UNSAFE PRESSURE
BUILD-UP WHICH CAN RESULT IN SERIOUS
INJURY OR DEATH AND/OR SEVERE PROPERTY
DAMAGE.
2. If, after following the aforementioned warning
directions, the relief valve weeps or will not seat
properly, it will need to be replaced. Verify that the
reason for the w eeping of the relief valve is in fact
the valve and not over pressurization of the system
due to the expansion tank being waterlogged or
undersized.
Review with the owner
1. Review the User Information Manual with the
owner.
2. Inform the owner of the maintenance schedule
specified in this manual and the User Information
Manual.
3. Remind the owner of the necessity to call a
professional licensed heating contractor in the
event that the boiler or the system exhibit any
for example). The automatically transmitted
maintenance message makes it is possible to carry
out preventive maintenance and therefore use the
maintenance kits defined by DDR Americas Inc.
i
When a maintenance message is displayed,
it must be acted upon within the 2 months
following the appearance of the message.
CAUTION
Reset the maintenance message to zero after each
inspection
WARNING
The behaviors of the boiler can be altered when parts
are removed and reinstalled. The boiler performance
needs to be checked after each maintenance
procedure to verify that it is operating properly. This
can be done by following the complete system start-
up procedure in this manual. Failure to follow proper
start-up procedure could result in severe personal
injury, substantial property damage or death.
* Annual maintenance is representative of 2000 hours each of boiler use per year
Содержание MCA Pro 115
Страница 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Страница 117: ......
Страница 118: ......
Страница 119: ......