MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
20
4. Installation
4.3.3. Ventilation
• Installation, servicing and maintenance of this
product must be performed by a licenced and
trained heating contractor, experienced in hot water
heating boilers as well as gas combustion. The
installation must conform to all national and local
codes having jurisdiction.
• In Canada: CSA B149.1 Gas Code
• In USA: ANSI Z223.1 (NFPA 54) Gas Code and
ASME CSD-1. If you have any technical questions
or need assistance with this product, please call
your local Sales Representative or DDR Americas
Inc.
(1)
Distance between the front of the boiler and the
internal wall of the cupboard.
DANGER
If the boiler is installed in a closed cupboard, respect
the minimum dimensions given in the diagram
(opposite). Also allow openings to obviate the
following hazards:
• Accumulation of gas
• Heating of the cupboard
• Failure to heed this warning could result in
personal injury, property damage or death.
In the absence of local code requirements, the
minimum cross section of the openings:
S1+S2 = 23.½ in
2
/150 cm
2
CAUTION
Follow local and national codes having jurisdiction
Содержание MCA Pro 115
Страница 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Страница 117: ......
Страница 118: ......
Страница 119: ......