95
MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
7.5.3. Assembling the boiler
1. Follow the procedure in reverse to re-assemble all
of the components.
Reinstall the front casing after start-up or
servicing
DANGER
Reinstall the front casing after start-up or servicing.
The front casing must be securely attached to
the boiler in order to prevent it from drawing air
from inside the boiler room. This is very important
especially if other appliances are located in the same
room as the boiler.
Inspect the gaskets of the front boiler casing.
There should be no tears or gaps in the gaskets.
If the gaskets are not in good condition, replace if
necessary.
If the front casing is not sealed or secured properly, it
could result in severe personal injury or death.
i
After a service complete the checklist.
See chapter: "Checklist for periodic
inspection and maintenance", page 114.
7. Checking and maintenance
Содержание MCA Pro 115
Страница 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Страница 117: ......
Страница 118: ......
Страница 119: ......