59
MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
4. Installation
4.9.11. Release input
The boiler has a release input. This input is on the RL
terminals of the connector.
CAUTION
Only suitable for potential-free contacts.
The behaviour of the input can be changed using
p 37
.
See chapter: "Parameter descriptions", page 76
4.10 Optional electrical connections
4.10.1. Box for the control PCBs
The control PCBs are located in the auxilliary control
cabinet for PCBs. See the instructions provided with the
control PCB.
1. Unclip the PCB cover.
2. Remove the cover.
i
The boiler comes standard with an auxilliary
control cabinet for the optional PCBs.
On/off
OT
RL
BL
Tout
Tdhw
2
x3
1
Содержание MCA Pro 115
Страница 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Страница 117: ......
Страница 118: ......
Страница 119: ......