
Test Operation
SiUS34-801A_b
234
VRVIII R-410A Heat Recovery 60Hz
10.2.6.2.2 Procedure of check operation
Conduct the following check operations or malfunction code [U3] will be displayed in the remote
controller and normal operation cannot be carried out:
Check shutoff valve opening
Check for miswiring
Judgment of piping length
Check refrigerant overcharge
Note:
Check operation can not be carried out at an outdoor temperature less than 23°F.
Perform the check operation at a day or time that the outdoor temperature is 23°F or more.
[Check Operation Procedure]
(1) Close the Electrical Components Box lid and all front panels except the side, and turn on the
power to the outside unit and all connected BS, indoor units. Be sure to turn the power on at
least 6 hours before operation in order to have power running to the crank case heater.
(2) Make the onsite settings as needed using the push button (BS1-BS5) on the outside unit PC-
board (A1P) with the power on. (See
10.2.7 Onsite Settings
)
(3) Perform the check operation following the Check Operation Method of the [Service Precautions]
label (lower) on the Electrical Components Box lid. (See figure 32) The system operates for
about 40~60 minutes and then automatically stops the check operation. If the malfunction code
is not displayed in the remote controller after the system stops, check operation is completed.
Normal operation will be possible after 5 minutes. If the malfunction code is displayed in the
remote controller, correct the malfunction following [Remote controller displays malfunction
code] and perform the check operation again.
Note:
For interrupting the check operation, push the RETURN button (BS3).
[Service Precaution] label (upper)
[Service Precaution] label (lower)
EL. COMPO.BOX (1) lid
EL. COMPO.BOX (2) lid
figure 32
EL. COMPO.BOX (1) lid
EL. COMPO.BOX (2) lid
[Service Precaution] label (upper)
[Service Precaution] label (lower)
REYQ72~120PYDN
REYQ72~144PTJU
REMQ72~120PYDN
REMQ72~120PTJU
Содержание VRV III
Страница 15: ...SiUS34 801A_b xiv ...
Страница 23: ...Model Selection SiUS34 801A_b 8 General Information ...
Страница 133: ...Field Settings SiUS34 801A_b 118 VRVIII R 410A Heat Pump 60Hz ...
Страница 254: ...SiUS34 801A_b Test Operation VRVIII R 410A Heat Recovery 60Hz 239 R 410A Label R 410A Label ...
Страница 329: ...Field Setting SiUS34 801A_b 314 Indoor Unit ...
Страница 340: ...SiUS34 801A_b Troubleshooting by Remote Controller Troubleshooting 325 ...
Страница 490: ...SiUS34 801A_b Piping Diagrams Appendix 475 Heat Pump 230V RXYQ72 96 120PTJU 3D058636A ...
Страница 491: ...Piping Diagrams SiUS34 801A_b 476 Appendix Heat Pump 230V RXYQ144PTJU 3D058640 ...
Страница 492: ...SiUS34 801A_b Piping Diagrams Appendix 477 Heat Recovery 460V REYQ72 96 120PYDN 3D058639A ...
Страница 493: ...Piping Diagrams SiUS34 801A_b 478 Appendix Heat Recovery 460V REMQ72PYDN 3D058637A ...
Страница 494: ...SiUS34 801A_b Piping Diagrams Appendix 479 Heat Recovery 460V REMQ96 120PYDN 3D058638A ...
Страница 495: ...Piping Diagrams SiUS34 801A_b 480 Appendix Heat Recovery 230V REYQ72 96 120PTJU 3D058639A ...
Страница 496: ...SiUS34 801A_b Piping Diagrams Appendix 481 Heat Recovery 230V REYQ144PTJU 3D058640 ...
Страница 497: ...Piping Diagrams SiUS34 801A_b 482 Appendix Heat Recovery 230V REMQ72PTJU 3D058637A ...
Страница 498: ...SiUS34 801A_b Piping Diagrams Appendix 483 Heat Recovery 230V REMQ96 120PTJU 3D058638A ...
Страница 501: ...Piping Diagrams SiUS34 801A_b 486 Appendix 1 3 BS Unit 4D057985A ...
Страница 537: ...Piping Installation Point SiUS34 801A_b 522 Appendix ...
Страница 543: ...Pressure Sensor SiUS34 801A_b 528 Appendix ...
Страница 559: ...Precautions for New Refrigerant R 410A SiUS34 801A_b 544 Precautions for New Refrigerant R 410A ...
Страница 563: ...SiUS34 801A_b iv Index ...