
SiUS34-801A_b
Test Operation
VRVIII R-410A Heat Recovery 60Hz
221
•
Calculate a necessary additional refrigerant charging amount according to the procedure for
calculation shown below.
*
Procedure for calculating additional refrigerant charging amount (Unit: 0.1 lb)
Correction amount with indoor unit
Correction amount with a total capacity of indoor units
•
If there is a refrigerant shortage after the completion of vacuum drying, charge liquid refrigerant
through the stop valve service port with the liquid and gas stop valves closed. .
•
If the refrigerant charging is still insufficient,
turn ON the power supply
following the
Check on amo
u
nt of refrigerant
charge
Is the correct
qu
antity of refrigerant charged?
The follo
w
ing method is a
v
aila
b
le for additional charging of
refrigerant.
(1) Calc
u
late additional refrigerant
qu
antity.
+
HEAT RECOVER SYSTEM
+
REFRIGERANT AMOUNT FOR EXCEEDING
CONNECTION CAPACITY OF INDOOR UNIT
MODEL NAME
THE AMOUNT OF
REFRIGERANT
INDOOR CONNECTION
CAPACITY
MODEL NAME
REYQ72 ~ 120PYDN
7.9 lb
REYQ72 ~ 240PYDN
REYQ72 ~ 240PTJU
REYQ72 ~ 144PTJU
REYQ144 ~ 192PYDN
2.2 lb
MORE THAN 100%
120% OR LESS
1.1 lb
REYQ168 ~ 192PTJU
REYQ216 ~ 240PYDN
3.3 lb
MORE THAN 120%
130% OR LESS
1.1 lb
REYQ216 ~ 240PTJU
R =
(Total length (ft)
of liquid piping
size at
φ
7/8)
(Total length (ft)
of liquid piping
size at
φ
5/8)
(Total length (ft)
of liquid piping
size at
φ
3/8)
(Total length (ft)
of liquid piping
size at
φ
3/4)
(Total length (ft)
of liquid piping
size at
φ
1/2)
(Total length (ft)
of liquid piping
size at
φ
1/4)
0.249
0.121
0.040
0.175
0.081
0.015
1.02
Check the stop valves for
conditions.
Has the additional refrigerant charging amount been
recorded on the "Precautions for servicing" label?
Check to be sure the stop valves are under the following
conditions.
Liquid-pipe
stop valve
Open
Open
Open
Suction pipe
stop valve
Open
Equalizing pipe
stop valve
Dual pressure gas
pipe stop valve
Содержание VRV III
Страница 15: ...SiUS34 801A_b xiv ...
Страница 23: ...Model Selection SiUS34 801A_b 8 General Information ...
Страница 133: ...Field Settings SiUS34 801A_b 118 VRVIII R 410A Heat Pump 60Hz ...
Страница 254: ...SiUS34 801A_b Test Operation VRVIII R 410A Heat Recovery 60Hz 239 R 410A Label R 410A Label ...
Страница 329: ...Field Setting SiUS34 801A_b 314 Indoor Unit ...
Страница 340: ...SiUS34 801A_b Troubleshooting by Remote Controller Troubleshooting 325 ...
Страница 490: ...SiUS34 801A_b Piping Diagrams Appendix 475 Heat Pump 230V RXYQ72 96 120PTJU 3D058636A ...
Страница 491: ...Piping Diagrams SiUS34 801A_b 476 Appendix Heat Pump 230V RXYQ144PTJU 3D058640 ...
Страница 492: ...SiUS34 801A_b Piping Diagrams Appendix 477 Heat Recovery 460V REYQ72 96 120PYDN 3D058639A ...
Страница 493: ...Piping Diagrams SiUS34 801A_b 478 Appendix Heat Recovery 460V REMQ72PYDN 3D058637A ...
Страница 494: ...SiUS34 801A_b Piping Diagrams Appendix 479 Heat Recovery 460V REMQ96 120PYDN 3D058638A ...
Страница 495: ...Piping Diagrams SiUS34 801A_b 480 Appendix Heat Recovery 230V REYQ72 96 120PTJU 3D058639A ...
Страница 496: ...SiUS34 801A_b Piping Diagrams Appendix 481 Heat Recovery 230V REYQ144PTJU 3D058640 ...
Страница 497: ...Piping Diagrams SiUS34 801A_b 482 Appendix Heat Recovery 230V REMQ72PTJU 3D058637A ...
Страница 498: ...SiUS34 801A_b Piping Diagrams Appendix 483 Heat Recovery 230V REMQ96 120PTJU 3D058638A ...
Страница 501: ...Piping Diagrams SiUS34 801A_b 486 Appendix 1 3 BS Unit 4D057985A ...
Страница 537: ...Piping Installation Point SiUS34 801A_b 522 Appendix ...
Страница 543: ...Pressure Sensor SiUS34 801A_b 528 Appendix ...
Страница 559: ...Precautions for New Refrigerant R 410A SiUS34 801A_b 544 Precautions for New Refrigerant R 410A ...
Страница 563: ...SiUS34 801A_b iv Index ...