SiBE37-701
Test Operation
Test Operation
185
In the test operation, the following checks and judgement will be performed:
Check of the stop valve opening
Check for wrong wiring
Check of refrigerant overcharge
Judgement of piping length
It takes between 40 and 60 minutes to complete the check operation.
Make sure to carry out the test operation after the first installation. Otherwise, the
malfunction code U3 will be displayed on the remote controller and normal operation can not
be carried out.
In case of a multi system, check the settings and results on the master unit.
Abnormallities on indoor units can not be checked for each unit individual. After the test
operation is finished, check the indoor units one by one by performing a normal operation
using the remote controller.
Note:
A test operation can not be carried out when the outdoor temperature is less than –5°C.
Test operation procedure
1. Close all front panels except the front panel of the electric box.
2. Turn ON the power to all outdoor units and the connected indoor units.
Be sure to turn on the power 6 hours before operation in order to have power running to the
crank case heater and to protect the compressor.
3. Make the field setting as described in the paragraph "1.2.6.3 Field setting" on page 181.
4. Press the
button once, and set to the SETTING MODE (H1P LED = OFF).
5. Press and hold the
button down for 5 seconds or more. The unit will start the test
operation.
The test operation is automatically carried out in cooling mode, the H2P LED will light up
and the messages "Test operation" and "Under centralized control" will display on the
remote controller.
It may take 10 minutes to bring the state of the refrigerant uniform before the compressor
starts.
During the test operation, the refrigerant running sound or the magnetic sound of a
solenoid valve may become loud and the LED display may change, but these are not
malfunctions.
During the test operation, it is not possible to stop the unit operation from a remote
controller. To abort the operation, press the
button. The unit will stop after
±30 seconds.
6. Close the front panel in order to let it not be the cause of misjudgement.
7. Check the test operation results by the LED display on the outdoor unit.
8. When the test operation is fully completed, normal operation will be possible after 5 minutes.
Otherwise, refer to "Correcting after abnormal completion of the test operation" on page 186
to take actions for correcting the abnormality.
H1P H2P H3P H4P H5P H6P H7P
Normal completion
h
h
i
h
h
h
h
Abnormal completion
h
i
i
h
h
h
h
BS1 MODE
BS4 TEST
BS3 RETURN
Содержание VRV III REYQ10PY1B
Страница 1: ...REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701 ...
Страница 111: ...Refrigerant Flow for Each Operation Mode SiBE37 701 100 Refrigerant Circuit ...
Страница 252: ...SiBE37 701 Troubleshooting by Remote Controller Troubleshooting 241 ...
Страница 395: ...Piping Diagrams SiBE37 701 384 Appendix 1 Piping Diagrams 1 1 Outdoor Unit REYQ8P 10P 12P 3D058154B S1NPH S2NPL ...
Страница 396: ...SiBE37 701 Piping Diagrams Appendix 385 REYQ14P 16P 3D058153B S2NPL S1NPH ...
Страница 397: ...Piping Diagrams SiBE37 701 386 Appendix REMQ8P 3D057743 ...
Страница 398: ...SiBE37 701 Piping Diagrams Appendix 387 REMQ10P 12P 3D057742 ...
Страница 399: ...Piping Diagrams SiBE37 701 388 Appendix REMQ14P 16P 3D057741 ...
Страница 400: ...SiBE37 701 Piping Diagrams Appendix 389 1 2 Indoor Unit FXFQ P ...
Страница 405: ...Piping Diagrams SiBE37 701 394 Appendix 1 3 BS Unit 4D057985A ...
Страница 414: ...SiBE37 701 Wiring Diagrams for Reference Appendix 403 2 3 Indoor Unit FXFQ20P 25P 32P 40P 50P 63P 80P 100P 125PVEB ...
Страница 415: ...Wiring Diagrams for Reference SiBE37 701 404 Appendix FXZQ20M 25M 32M 40M 50MV1 ...
Страница 416: ...SiBE37 701 Wiring Diagrams for Reference Appendix 405 FXCQ20M 25M 32M 63MV3 ...
Страница 417: ...Wiring Diagrams for Reference SiBE37 701 406 Appendix FXCQ40M 50M 80M 125MV3 ...
Страница 420: ...SiBE37 701 Wiring Diagrams for Reference Appendix 409 FXDQ20M 25MV3 ...
Страница 421: ...Wiring Diagrams for Reference SiBE37 701 410 Appendix FXSQ20M 25M 32M 40M 50M 63MV3 ...
Страница 422: ...SiBE37 701 Wiring Diagrams for Reference Appendix 411 FXSQ80M 100M 125MV3 ...
Страница 447: ...Example of connection SiBE37 701 436 Appendix ...
Страница 453: ...Method of Checking the Inverter s Power Transistors and Diode Modules SiBE37 701 442 Appendix ...
Страница 467: ...SiBE37 701 iv Index ...
Страница 471: ...SiBE37 701 viii Drawings Flow Charts ...