SiBE37-701
Example of connection
Appendix
435
a
Required Conditions
Example Drawings
1. It is necessary to increase the pipe size between the first branch kit
and the final branch kit. (Reducers must be procured on site)
However, the pipes that are same pipe size with main pipe must not
be increased.
2. For calculation of Total extension length, the actual length of
above pipes must be doubled. (except main pipe and the pipes
that are not increased)
3. Indoor unit to the nearest branch kit
≤
40 m
4. The difference between
[Outdoor unit to the farthest indoor unit] and [Outdoor unit
to the nearest indoor unit]
≤
40 m
8 b + c + d + e + f + g + p
≤
90 m
increase the pipe size of b, c, d, e, f, g
a + b × 2 + c × 2 + d × 2 + e × 2 + f × 2 + g × 2
+ h + i + j + k + l + m + n + p
≤
1000 m
h, i, j....... p
≤
40 m
The farthest indoor unit 8
The nearest indoor unit 1
( a + b + c + d + e + f + g + p ) - ( a + h )
≤
40 m
Increase the pipe size as follows
φ
9.5
→ φ
12.7
φ
12.7
→ φ
15.9
φ
15.9
→ φ
19.1
φ
19.1
→ φ
22.2
φ
22.2
→ φ
25.4*
φ
28.6
→ φ
31.8*
φ
34.9
→ φ
38.1*
a
A
B
C
D
E
F
G
b
c
d
e
f
g
h
i
j
k
l
m
n
1
2
3
4
5
6
7
8
H1
p
Outdoor unit
REFNET joint (A-G)
Indoor units ( 1 - 8 )
*If available on the site, use this size. Otherwise it can not be increased.
How to calculate the
additional refrigerant
to be charged
Additional refrigerant to
be charged : R(kg)
R should be rounded
off in units of 0.1 kg.
R =
Total length(m)
of liquid piping
size at
φ
22.2
Total length(m)
of liquid piping
size at
φ
15.9
Total length(m)
of liquid piping
size at
φ
9.5
Total length(m)
of liquid piping
size at
φ
19.1
Total length(m)
of liquid piping
size at
φ
12.7
Total length(m)
of liquid piping
size at
φ
6.4
0.37
0.18
0.059
0.26
0.12
0.022
1.02
HEAT RECOVER SYSTEM
MODEL NAME
THE AMOUNT OF REFRIGERANT
REYQ8 ~ 16PY1
REYQ18 ~ 20PY1
REYQ22 ~ 24PY1
REYQ26PY1
REYQ28 ~ 30PY1
REYQ32 ~ 40PY1
REYQ42PY1
REYQ44 ~ 46PY1
REYQ48PY1
3.6kg
1.0kg
1.5kg
2.0kg
2.5kg
3.0kg
3.5kg
4.0kg
4.5kg
REFRIGERANT AMOUNT
FOR EXCEEDING CONNECTION
CAPACITY OF INDOOR UNIT
INDOOR
CONNECTION
CAPACITY
MORE THAN 100%
120% OR LESS
MORE THAN 120%
130% OR LESS
MODEL NAME
REYQ8
~
32PY1
REYQ34
~
48PY1
0.5kg
0.5kg 1.0kg
Example for refrigerant branch using REFNET joint and REFNET header for the systems and each pipe length as shown below.
Outdoor system : REYQ34PY1
Total capacity of indoor unit : 116%
R =
( 50 × 0.26 + 1 × 0.18 + 3 × 0.12 + 156 × 0.059 + 20 × 0.022 )×1.02 + 3.0 + 0.5
a :
φ
19.1 × 30m
b :
φ
19.1 × 20m
c :
φ
9.5 × 10m
d :
φ
9.5 × 10m
e :
φ
9.5 × 10m
f :
φ
9.5 × 10m
g :
φ
9.5 × 10m
h :
φ
9.5 × 10m
i :
φ
9.5 × 10m
j :
φ
9.5 × 10m
k :
φ
9.5 × 20m
l :
φ
9.5 × 20m
m :
φ
9.5 × 20m
n :
φ
9.5 × 10m
o :
φ
6.4 × 10m
p :
φ
6.4 × 10m
r :
φ
12.7 × 3m
s :
φ
9.5 × 3m
t :
φ
9.5 × 3m
u :
φ
15.9 × 1m
a, b
u
r
c~n, s, t
o, p
REYQ34PY1 116%
= 27.148
27.1kg
Round off in units of 0.1 kg.
Note 1.
When the equivalent pipe length between outdor and indoor units is 90m or
more, the size of main pipes on the liquid side (refer to figure 9) must be
increased according to the right table.
(Never increase suction gas pipe and HP/LP gas pipe.)
(Refer to figure 9)
1.
Outdoor unit
2.
Main pipes
3.
Increase only liquid pipe size
4.
First refrigerant branch kit
5.
BS unit
6.
Indoor unit
Note 2. Allowable length after the first refrigerant branch kit to indoor units is 40m or less, however it can be extended up to 90m if all the following conditions are satisfied. (In case of “
Branch with REFNET joint
”)
System
REYQ8 ~ 10PY1
REYQ12 ~ 16PY1
REYQ18 ~ 24PY1
REYQ26 ~ 48PY1
Liquid pipe
φ
9.5
→
φ
12.7
φ
12.7
→
φ
15.9
φ
15.9
→
φ
19.1
φ
19.1
→
φ
22.2
Содержание VRV III REYQ10PY1B
Страница 1: ...REYQ8 48PY1B R 410A Heat Recovery 50Hz SiBE37 701 ...
Страница 111: ...Refrigerant Flow for Each Operation Mode SiBE37 701 100 Refrigerant Circuit ...
Страница 252: ...SiBE37 701 Troubleshooting by Remote Controller Troubleshooting 241 ...
Страница 395: ...Piping Diagrams SiBE37 701 384 Appendix 1 Piping Diagrams 1 1 Outdoor Unit REYQ8P 10P 12P 3D058154B S1NPH S2NPL ...
Страница 396: ...SiBE37 701 Piping Diagrams Appendix 385 REYQ14P 16P 3D058153B S2NPL S1NPH ...
Страница 397: ...Piping Diagrams SiBE37 701 386 Appendix REMQ8P 3D057743 ...
Страница 398: ...SiBE37 701 Piping Diagrams Appendix 387 REMQ10P 12P 3D057742 ...
Страница 399: ...Piping Diagrams SiBE37 701 388 Appendix REMQ14P 16P 3D057741 ...
Страница 400: ...SiBE37 701 Piping Diagrams Appendix 389 1 2 Indoor Unit FXFQ P ...
Страница 405: ...Piping Diagrams SiBE37 701 394 Appendix 1 3 BS Unit 4D057985A ...
Страница 414: ...SiBE37 701 Wiring Diagrams for Reference Appendix 403 2 3 Indoor Unit FXFQ20P 25P 32P 40P 50P 63P 80P 100P 125PVEB ...
Страница 415: ...Wiring Diagrams for Reference SiBE37 701 404 Appendix FXZQ20M 25M 32M 40M 50MV1 ...
Страница 416: ...SiBE37 701 Wiring Diagrams for Reference Appendix 405 FXCQ20M 25M 32M 63MV3 ...
Страница 417: ...Wiring Diagrams for Reference SiBE37 701 406 Appendix FXCQ40M 50M 80M 125MV3 ...
Страница 420: ...SiBE37 701 Wiring Diagrams for Reference Appendix 409 FXDQ20M 25MV3 ...
Страница 421: ...Wiring Diagrams for Reference SiBE37 701 410 Appendix FXSQ20M 25M 32M 40M 50M 63MV3 ...
Страница 422: ...SiBE37 701 Wiring Diagrams for Reference Appendix 411 FXSQ80M 100M 125MV3 ...
Страница 447: ...Example of connection SiBE37 701 436 Appendix ...
Страница 453: ...Method of Checking the Inverter s Power Transistors and Diode Modules SiBE37 701 442 Appendix ...
Страница 467: ...SiBE37 701 iv Index ...
Страница 471: ...SiBE37 701 viii Drawings Flow Charts ...