I.B.
35-557
21 of 45
BN DE-SENSITIZING RELAY TIME DELAY TEST
Before commencing work, refer to the Safety Information.
Switch Positions
Network protector closed, breaker does not have to be in the automatic mode.
FUNCTION Switch – “RELAY” position
I & PV Switch – PVA position
Supp VM Switch – CA position
PHASE switch – 180 position
Single PH Test Switch – OFF
VARIAC – zero position
SUPPLY Switch – 216 or 480 position depending on network system voltage
BN DE-SENSITIZING RELAY TIME DELAY TEST
With the full compliment of relays in place (CNJ, CN-33 & BN), rapidly increase the reverse trip value
above the nominal CN-33 trip value. Start the timing of the BN the moment the CN-33 trip contacts
make. Stop the timing cycle when the breaker opens it main contact.
Содержание HWT-500
Страница 25: ...I B 35 557 25 of 45 THIS PAGE IS BLANK ...
Страница 42: ...I B 35 557 42 of 45 ...
Страница 43: ...I B 35 557 1 of 45 RELAYMODULEWIRING 216V Relay Module Wiring ...
Страница 44: ...I B 35 557 2 of 45 ...
Страница 45: ...I B 35 557 3 of 45 RELAYMODULEW IRING 480Volt Relay Module Wiring ...